Commercial
High Tech
Biotech/Pharmaceutical:
Pharm. Research Facility
Abbott Pharmaceuticals
Micro Electronics:
Private Client Fab 23
Private Client D1D
Micron Fab 5 Facility
Private Client Fab 9
Wafertech Project
Mission Critical:
Exodus Communications
Industrial
Nuclear

 
     

Private Client Fab 23
Colorado Springs, CO
 
“Clayton mobilized the project quickly supporting our needs on schedule. Since the building shell already existed, it was imperative to the success of the schedule. Clayton came through.”
Will Hopkins
DPR Construction


A 100,000 SF Class 1 Cleanroom in an existing building. A fast-paced project, which required immediate mobilization. Clayton installed the Intumescent fireproofing materials with high level of smoothness in the clean room. The $3.1 Million fireproofing contract was completed in 6 weeks.