B1 Bomber Plant
Palmdale, CA
 
“Clayton was proud to be part of this facility which helped put an end to the cold war and
solidify our nations defense system”


The B1 Bomber facility was constructed under Presidential Decree to complete this critical defense facility on time. The projects compressed schedule required work around the clock, 6-days per week. Clayton provided the coatings and cementitious fireproofing of the new aircraft production facility. Work was performed 135-feet above the hanger floor, utilizing an engineered cable rigging system and platform. The $8 Million contract was completed on time, with no claims.